Discover how groundworks for a hospital's new modular building achieved a three-week turnaround, revolutionising healthcare infrastructure construction.
Recently, we returned to community interest company Living Potential to lay down two new concrete pathways. This increased accessibility for their wheelchair users, and alongside a new rainwater drainage system has been a welcome addition to the farm and the people they support.
This case study will highlight the successful completion of the site-wide service trench within the programme, resulting in positive feedback from the site manager.
As part of its commitment to sustainability, the MOJ built a new 30-space car park with integrated street lighting and EV charging points alongside Shanco’s simultaneous works within the facility. This case study outlines the planning, design and implementation of the project, highlighting the benefits and challenges faced during its execution.
St. George's Hospital, located in Tooting, South London, worked with Shanco on a significant expansion project to maintain the hospital's high standard of patient care and accommodate the growing healthcare needs of the region.
It’s a pleasure to introduce our new Senior Estimator Tom Coggin as we explore his lifelong passion for construction, his take on the job role within the Shanco team, and his advice for those considering a similar position within the construction industry.
Discover Shanco's achievements in expanding the HMP Category D facility, overcoming complex engineering challenges to deliver high-quality work while prioritizing safety and efficiency.