How does Shanco address environmental concerns?
August 13, 2024Complete Customer Satisfaction: Shanco Scores 100%
August 20, 2024Shanco successfully completed comprehensive groundworks for a prestigious care home project in Rownhams, Southampton. The project involved significant earthworks and infrastructure development to support the construction of a state-of-the-art care facility.
The Project
The project required extensive groundwork because of the sloping terrain of the site. The scope of work included the removal of 18,000 tonnes of muck, construction of reinforced foundations, crane base and lift pit bases, and the installation of internal and external drainage systems. Additional tasks included establishing two main connections for surface water and foul water, installing new utility services, creating a car park with 31 permeable parking bays—including six EV charging points—and completing both hard and soft landscaping.
The Approch
To tackle the challenging site conditions, Shanco implemented a phased approach that allowed for simultaneous progress across different areas of the site. This strategy ensured that the muck shift operation did not hinder the overall project timeline. By carefully coordinating the work, Shanco facilitated the progress of other contractors on-site, maintaining segregated working spaces to minimise disruption. This approach ensured that the project advanced smoothly, even in areas with ongoing muck removal.
The Results:
“The collaborative effort and communication within the team were highly commendable. Surpassing expectations, the first phase was completed ahead of schedule. This project stands out as the best experience with Shanco, and its exceptional level of work and infrastructure sets a benchmark for all future projects. The site has garnered significant attention, both internally and externally, acknowledging Shanco’s impressive accomplishments during the initial phase.”
Site Manager, LNT
Shanco delivered 70% of the project within the first three months, establishing a safe, clean, and organised environment for subsequent trades to carry out their work. Shanco completed the groundworks on time and to the highest standards, showcasing Shanco’s commitment to meticulous planning, coordination, and communication. The successful completion of this groundwork project marks another achievement for Shanco in collaboration with LNT, contributing to the development of a vital community asset in Rownhams.